Selling the Kit

I have come to the realization that even if I worked on the Velocity build full time, I would still be approaching 70 years old when it is finally usable as an aircraft for traveling. With so many things going on – aging parents, home upkeep, keeping pace with entropy, it is not possible for me to spend the quality time that the Velocity build requires and deserves. So I have decided to sell the kit, hopefully to someone who can appreciate the work that I have done, and who can finish the airplane and fly it and enjoy it the way it was meant to.

So the Velocity kit is for sale. Here are some pictures that I took of the fuselage and wings in their present state, along with photos of all the parts that go with them. I have heard that the factory has a many-month wait time for delivery of new kits. Purchasing this kit will let you start building NOW, with no wait, and also give you a head start on some of the assembly, all for a lower price than the factory list price!

Door Pin Receptacles and Structural Beams

With the doors in place, the steel receptacle sleeves that will accept the door pins were positioned with wooden spacers, filleted in place with micro, and covered with BID.

The carbon fiber structural members that fit around the doors and across the ceiling were sanded to fit the inner surface of the fuselage. The seat belt hard points mounts were fabricated from wood shaped to fit inside the carbon beam.

Fitting Doors

What a pain in the ass. The doors do not have the same shape as the fuselage, so they have to be “coaxed” into shape with force and heat, applied over a long period of time. I used all-thread rods to pull the doors in some places, and 1×1 dowels to push in other places, all while keeping the doors toasty hot with halogen lamps. Crude, and not very effective.

Door Hinges

The door flange was trimmed to a uniform size along the door perimeter.

The door hinges were constrained to be parallel with an aluminum angle, and were bonded to the door tabs. The tabs were drilled to match the hinges, and then the hinges were tapped. The door tabs were countersunk for the screws, and then the hinges were bonded with cabo, pulled flush with the screws, and covered with BID.

Cowling and Door Flanges

The cowling top half was cut at the proper distance from the firewall, with hot glue retainers added to keep it in place as the cut progressed. The inner surface next to the firewall was then protected with duct tape, and a wet tape was used to make a flange. After curing, the fuselage and flange were drilled for clecoes, the cowling was removed, and sanded to clean up.

The door cutouts were hot-glued back in place after covering their inside surfaces with duct tape. Layup tape was then used to create an inner door flange.