Pietenpol project

PIETENPOL PROJECT • ACCEPTING OFFERS • Partially completed Pietenpol long project.Change of mission.Some measurements may be Grega. Fuselage, rudder, elevator and vertical and horizontal stabilizers complete. started over with Riblett ribs. steam former, rib template plus mahogany plywood and rib wood to complete from AS, still in box. misc parts such as rough cast aluminum hinges and precut metal pieces. Firewall,tires,gauges, baffling, brakes, huge numbers of aircraft nuts and bolts, Gauges and throttles, stall horn, tailwheel and interior wood. full set of authentic plans andWeight and Balance book by WW. Corvair also available • Contact Blair Fonda , Owner - located Green Cove Springs, FL 32043 United States Telephone: ---------- • Posted April 29, 2025 • Show all Ads posted by this Advertiser • Recommend This Ad to a Friend • Email Advertiser • Save to Watchlist • Report This Ad • View Larger Images
 
DIRECTORY